Mihai
  • 0 followers
  • 0 following
  • 23 posts
  • 1 comment received
  • 6 points

Recent Activity

  • posted
  • posted
  • posted
  • posted
  • commented on

Lists

Posts

  • Wheatstone Project Completes Topsides Floatover Installation
    The Wheatstone Project successfully completed one of the largest offshore platform installations in Chevron's history, marking a major project milestone.

    Watch the journey of the Wheatstone topsides from fabrication to load-out, the sail-away, the arrival and the float-over onto the steel-gravity structure base.

    The Wheatstone Platform is the largest offshore gas processing platform ever installed in Australia, with a topsides weight of about 37,000 metric tons and the largest float-over installation Chevron has ever delivered globally.
  • An engineer will always be an engineer!
    Dirty hands and dirty mind!
Jobs from Indeed